Union Street Geotechnical Union Street Geotechnical

  • Home
  • About
  • Services
  • Projects
  • Contact
  • Sylvan Lake - NexSource Centre
  • Rocky Mountain House - Frac Sand Facility
  • Leduc - Wyndham Garden Hotel
  • Home
  • About
  • Services
  • Projects
    • Sylvan Lake - NexSource Centre
    • Rocky Mountain House - Frac Sand Facility
    • Leduc - Wyndham Garden Hotel
  • Contact

Union•Street

•Frac Sand Facility•

DESCRIPTION

With the continued growth of the oil and gas sector in central Alberta, Diversity Technologies Corporation (Di-Corp) determined that an expansion in capacity was required for continued service. In spring 2014, Union Street Geotechnical Ltd. performed a geotechnical investigation at the 13.4 ha site for the proposed Frac Sand Storage and Handling Facility. The geotechnical investigation provided a description of soil type and condition as well as suitable foundation recommendations, providing (Di-Corp) with the necessary information to finalize construction details. 

Construction of the new facility commenced summer 2014 and included railroad realignment, storage silo infrastructure, rail pit, office building, and gravel road/yard construction. Union Street provided steel pipe pile design, subgrade,subbase, and base materials testing as well as slab on grade concrete testing. 

Project was completed winter 2015.

Return to Projects

ADDITIONAL PHOTOS

Home
About
Services
Contact

Make a free website with Yola